ACT WorkKeys
ACT WorkKeys is a trademark of its owner, which is not affiliated with and does not endorse Test Treasure Publication or TTP Prep.
ACT WorkKeys is a trademark of its owner, which is not affiliated with and does not endorse Test Treasure Publication or TTP Prep.
10 sample questions for the ACT WorkKeys, with the correct answer and an explanation for each. No account needed. Try each one before you open the answer.
Sections covered on the exam: Workplace Documents, Applied Math, Graphic Literacy.
Question 1 · Workplace Documents
Answer: B. 135
Multiply the rate by the time: 18 × 7.5 = 135 cartons. 126 uses 7 hours and 144 uses 8 hours, which come from rounding the shift length.
Question 2 · Workplace Documents
Answer: B. 8 hours
From 6:45 a.m. to 3:15 p.m. is 8 hours 30 minutes. Subtract the 30-minute unpaid break: 8 hours. 8.5 hours forgets the break.
Question 3 · Graphic Literacy
Answer: C. $2,700
Paper goods are 15% of $18,000, and 0.15 x $18,000 = $2,700. The $1,800 choice uses the 10% cleaning-supplies slice, and $3,600 uses the 20% beverages slice.
Question 4 · Workplace Documents
Answer: A. 30 minutes
All 120 gpm splits among the three lines, so Line C carries 120 - 45 - 35 = 40 gpm, and 1,200 / 40 = 30 minutes. The 10-minute choice uses the full pump output, and about 34 minutes uses Line B's 35 gpm.
Question 5 · Workplace Documents
EMAIL From: Facilities Manager | To: All Third-Floor Staff | Subject: Carpet replacement this weekend. Carpet on the third floor will be replaced on Saturday the 14th and Sunday the 15th. By 5:00 p.m. on Friday the 13th, please clear everything from the floor under and around your desk, including power strips, bags, and boxes. Items left on the floor will be moved to the storage room on the second floor and may be picked up on Monday after 10:00 a.m. Desktop computers can stay on desks but must be shut down, not left in sleep mode. Staff who need to work this weekend should reserve a space in the fourth-floor hoteling area through the room-booking system.
Answer: D. shared workspace that staff reserve for temporary use
The email tells staff who must work during the carpet job to reserve a space in the hoteling area through the room-booking system, so it is shared workspace booked for short-term use. Storage for moved items is on the second floor, not the fourth.
Question 6 · Workplace Documents
Answer: B. 24
Each roll seals 42 boxes: 1,000 ÷ 42 ≈ 23.8, so 24 rolls. The strips per box are already built into the 42 boxes per roll, so 3 is not used again; 71 divides 3,000 strips by 42.
Question 7 · Workplace Documents
Answer: B. 40 hours
Each shift runs from 10:45 p.m. to 7:15 a.m., which is 8 hours 30 minutes. Minus the 30-minute break: 8 paid hours. Five nights: 5 × 8 = 40 hours. 42.5 hours forgets the breaks.
Question 8 · Graphic Literacy
Answer: B. Between 20 and 30 minutes
The reading at 20 minutes (362°F) is inside the limits, and the reading at 30 minutes (371°F) is above 370°F, so that is the first move from inside to outside. From 0 to 10 minutes the oven moved the other way, from outside (340) to inside (355); the drop from 358 to 349 at 50 to 60 minutes also leaves the limits, but it happens later.
Question 9 · Workplace Documents
Answer: D. Open V3 and V5; close V1, V2, and V4
Closing V1 and V2 isolates the dryer on both sides, opening V3 sends air around it through the bypass, opening V5 feeds Assembly, and closing V4 shuts off the paint booth. Leaving V2 open would let air flow back into the dryer while it is being serviced, and opening V4 would keep supplying the paint booth.
Question 10 · Workplace Documents
MEMO To: All Nursing Assistants, 3 West | From: Unit Manager | Re: Bed alarm procedure. Starting Monday, every patient with a fall-risk score of 45 or higher must have the bed alarm turned on whenever the patient is in bed. Check that the alarm is on at the start of each shift and after every repositioning. Document each check in the flowsheet under 'Safety.' Direct questions to the charge nurse.
Answer: A. At the start of each shift and after every repositioning
The memo says to check that the alarm is on at the start of each shift and after every repositioning. The other choices add times that do not appear in the memo.
TTP Prep has 200 ACT WorkKeys practice questions with explanations, timed and mock-exam modes, 191 flashcards, interactive lessons, a printable cheat sheet and a readiness score. Start free, no card needed.
More free questions: browse every exam.